Yaoheba Hydropower Station on the Nanya River, Sichuan (Large Diameter + High Internal Pressure + Fault Displacement)

2026-10-12

Industry: Hydropower

Operating Conditions: Pressure steel pipe DN4000, internal pressure 2.5 MPa, crossing a fault, radial displacement ±70 mm, 5 expansion joints.

Solution: Large-diameter thick-walled bellows (316L, wall thickness 12 mm) + limit rods, external reinforcement rings.

Results: Operated normally for 20 years, absorbed fault displacement, and prevented steel pipe rupture.

Key Points: Large-diameter, high-pressure systems must include reinforcement rings + stability verification + limit protection.