PROJECTS

Home>PROJECTS

Qinghai-Tibet Plateau Long-Distance Refined Oil Pipeline (Low Temperature + Large Temperature Difference + Permafrost Displacement)

2026-10-12

Industry: Refined Oil Pipeline

Operating Conditions: Altitude 4,500 m, Pipe Diameter DN600, Medium: Refined Oil, Daily Temperature Difference 40°C, Permafrost Thaw-Freeze Lateral Displacement ±80 mm, Pressure 10 MPa.

Solution: Adoption of a hinged universal lateral expansion joint assembly (304 + Inconel 625), 12 waves, single-wave compensation range ±15 mm.

Results: Operated for 8 years without leakage; successfully absorbed thermal expansion and permafrost slippage, preventing pipe rack overload and weld cracking.

Results: Operated for 8 years without leakage; successfully absorbed thermal expansion and permafrost slippage, preventing pipe rack overload and weld cracking.

85544f0e-d023-4b47-9c40-b3f0777db0a9.jpg

REQUEST A QUOTE
Inquiry

Contact us